Insulation Material - STP Liqued Gold

Product Code (SKU): 07.0056
Manufacturer: STP
Vibration damping Mastic Noise Absortion
Availability: Available Now
110.00 €
99.00 €

 

Vibration damping Mastic Noise Absortion

 

Description

NoiseLIQUIDator (vibration damping) - Anti-corrosion two-component vibration damping mastic. A new generation material based on oligomers with special targeted additives. Reduces the noise level in the cabin from running noise: water, mud, sandblasting and gravel, wheel noise, suspension operation.

Mounting conditions: 

The surface must first be cleaned, degreased and dried. To prepare the working composition, add component B to the main component A and stir with a mixer (drill with a nozzle) for 5 minutes until smooth. Provide access to the work surface with a lift, inspection hole or jack, or remove the wheel. Apply a 2 mm layer of mastic with a spatula. One can is enough to process one arch. Attention! Working time with mastic - no more than 40 minutes! The mastic hardens within 24 hours. The maximum value of vibration absorption occurs after 7 days. Works can be carried out at temperatures from + 10 ° C to + 40 ° C.

Safety regulations:

It is recommended to work with gloves and to protect the eyes with special goggles, preferably using a respirator. Avoid contact with clothing and the outer surface of the body - the mastic is difficult to wash off from any surface. The room must be well ventilated.

 

Vibration damping Mastic Noise Absortion

 

Description

NoiseLIQUIDator (vibration damping) - Anti-corrosion two-component vibration damping mastic. A new generation material based on oligomers with special targeted additives. Reduces the noise level in the cabin from running noise: water, mud, sandblasting and gravel, wheel noise, suspension operation.

Mounting conditions: 

The surface must first be cleaned, degreased and dried. To prepare the working composition, add component B to the main component A and stir with a mixer (drill with a nozzle) for 5 minutes until smooth. Provide access to the work surface with a lift, inspection hole or jack, or remove the wheel. Apply a 2 mm layer of mastic with a spatula. One can is enough to process one arch. Attention! Working time with mastic - no more than 40 minutes! The mastic hardens within 24 hours. The maximum value of vibration absorption occurs after 7 days. Works can be carried out at temperatures from + 10 ° C to + 40 ° C.

Safety regulations:

It is recommended to work with gloves and to protect the eyes with special goggles, preferably using a respirator. Avoid contact with clothing and the outer surface of the body - the mastic is difficult to wash off from any surface. The room must be well ventilated.

Products specifications
Contents 1 component 1kg and 1 component 0.1kg
Products specifications
Contents 1 component 1kg and 1 component 0.1kg